Graforce and Kawasaki Gas Turbine Europe are cooperating on a joint plant concept combining Graforce's methane plasmalysis technology with Kawasaki's hydrogen turbines for zero-emission heat and power generation. First customer projects are in development.
Kawasaki Heavy Industries, through its subsidiary Kawasaki Gas Turbine Europe GmbH, received an order from Chevron Phillips Chemical International N.V. to convert a 1.8MW natural gas turbine cogeneration system at the Tessenderlo plant in Belgium to co-fire up to 30% hydrogen. The conversion is scheduled for July 2023.
PGE Energia Ciepła S.A. and ELEMONT S.A. have signed a contract for the construction of a cogeneration system at the Kielce CHP plant, consisting of a gas turbine unit with 8 MWe electrical output and a water waste-heat boiler with 12 MWt thermal output.