Loading…
PGE Energia Ciepła S.A. and ELEMONT S.A. have signed a contract for the construction of a cogeneration system at the Kielce CHP plant, consisting of a gas turbine unit with 8 MWe electrical output and a water waste-heat boiler with 12 MWt thermal output.
“The construction of the gas unit, based on a modern Kawasaki turbine with a waste-heat boiler, fits in perfectly with the policy of reducing emissions of harmful compounds into the atmosphere and producing clean energy for the city.”econstruction.pl
Summarized from public sources; check the original articles before acting on it.