Loading…
Baker Hughes Masoneilan has won a package of high-pressure API-6A control valves for the Mero-3 FPSO in the Santos Basin, offshore Brazil. The valves were made at its Conde, France facility and shipped in January 2023, with production expected in 2024.
“Baker Hughes Masoneilan won a critical API control valve package for the Mero-3 offshore FPSO project.”valve-world-americas.com
Summarized from public sources; check the original articles before acting on it.