Baker Hughes received a significant award from Venture Global for a modular liquefaction package with cold boxes tied to the expansion of the Plaquemines LNG facility in Louisiana.
Baker Hughes booked an order from Venture Global to supply 13 gas compression systems powered by Frame 5/2E turbines for the Cloud Connector Pipeline feeding the Plaquemines LNG facility in Louisiana. It is the second such order for the project.
Baker Hughes was awarded a contract by Venture Global under a master equipment supply agreement to provide a modularized LNG liquefaction train system and power island for US projects, with the contract booked in Q3 2023.
D'Hondt Thermal Solutions (DH-TS) was awarded by KZJV the design and manufacture of modularized air-cooled heat exchangers for the Plaquemines LNG facility in Louisiana owned by Venture Global. Engineering will be in France and manufacturing in Korea.
BHGE was selected as key supplier of Masoneilan control valves and Consolidated safety relief valves for Venture Global's LNG liquefaction facility in Louisiana. The order covers nearly 1,000 valves for the first phase of the 10 MTPY project.
Baker Hughes was selected as key supplier of Masoneilan control valves and Consolidated safety relief valves for Venture Global's LNG liquefaction facility in Louisiana, USA. The order includes nearly 1,000 valves and is the first phase of three plants.