Loading…
Ampo Poyam Valves supplied an integrated smart solution with 25 severe-service ball valves, 25 control panels and one hydraulic power unit for CBMM's Tailings Thickening Dam No. 8 project at its Araxá plant in Minas Gerais, Brazil. The article is dated September 8, 2026.
“AMPO POYAM VALVES ha suministrado con éxito una solución ISS (Integrated Smart Solution) completa para el proyecto de Espesamiento de Relaves”ampo.com
Summarized from public sources; check the original articles before acting on it.