Loading…
Sulzer was awarded a contract to supply integrated pump skids, including water injection and booster pumps, for two FPSO vessels being built by Seatrium for Petrobras. Delivery of the pump packages is scheduled for early 2026. The article is dated 26 November 2025.
“Global pump manufacturer Sulzer has been awarded a contract to supply water injection packages for two new Floating Production Storage and Offloading (FPSO) vessels being built for Petrobras by Seatrium.”operationsengineer.org.uk
Summarized from public sources; check the original articles before acting on it.