Loading…
A working association of Tricon and Suvic is building a heat pump plant recovering waste heat for Fortum's district heating network in the Hepokorpi data centre area of Espoo. The plant includes heat pumps, air-to-water heat pumps, and an electric boiler. Heat production is targeted for the 2025–2026 heating season.
“The aim is to produce heat from the 2025–2026 heating season onwards.”globenewswire.com
Summarized from public sources; check the original articles before acting on it.