Loading…
A working association of Tricon and Suvic is building a heat pump plant recovering waste heat for Fortum's district heating network in the Hepokorpi data centre area of Espoo. The plant includes heat pumps, air-to-water heat pumps, and an electric boiler. Heat production is targeted for the 2025–2026 heating season.