Loading…

Valmet will deliver Valmet DNA Turbine Automation Systems for both units at Fortum's nuclear power plant in Loviisa, Finland, including a training simulator upgrade. The deliveries are scheduled for 2026 and 2028.
“The existing turbine protection and control systems are reaching the end of their technical service life, and the availability of spare parts is diminishing.”valmet.com
Summarized from public sources; check the original articles before acting on it.