Loading…

Vattenfall awarded Vinci subsidiary Nuvia a contract to decommission unit 1 and unit 2 at the Ringhals nuclear power plant in Sweden. The project will last from 2025 to 2031, processing about 30,000 tonnes of materials.
“Nuvia will take down unit 1, a boiling water reactor shut down in 2020, and unit 2, a pressurised water reactor shut down the year before.”globalconstructionreview.com
Summarized from public sources; check the original articles before acting on it.