Loading…
A joint venture of Elsewedy Electric and Sinohydro secured an EPC contract from Acwa Power for the $2.2 billion Rabigh 2 IPP expansion project in Saudi Arabia. The 2.3 GW gas-fired combined-cycle plant is targeted for commercial operation in May 2029.
“Elsewedy Electric said this formally launches full-scale execution of the 2.3 GW facility under the joint venture’s responsibility.”gulfconstructiononline.com
Summarized from public sources; check the original articles before acting on it.