Loading…
Saipem awarded Baker Hughes an EPC subcontract for over 250 Consolidated Pressure Relief Valves, including API 10/15k valves, for the P-79 FPSO being built for Petrobras in the Búzios field, delivery scheduled for 2025.
“In the development of the EPC, SAIPEM awarded Baker Hughes over 250 Consolidated Pressure Relief Valves including high pressure API 10/15k valves.”valvemagazine.com
Summarized from public sources; check the original articles before acting on it.