Loading…

UCED signed a contract with GE to expand its Prostějov power plant to nearly double its capacity (108 MW) by adding a combined cycle unit with an LM6000 gas turbine. Investment is 1 billion CZK.
“We are excited to be cooperating with GE.”creditasgroup.cz
Summarized from public sources; check the original articles before acting on it.