Loading…

JDR has been awarded a contract by Seaway 7 to supply 100km of 66kV subsea array cables for the 900MW EnBW He Dreiht offshore wind farm in Germany. The cables will be manufactured at JDR's Hartlepool, UK facility and installed in 2025.
“JDR has been awarded a contract by Seaway 7 ASA to supply 66kV subsea array cables for the EnBW He Dreiht offshore wind farm in Germany.”cabletechnologynews.co.uk
Summarized from public sources; check the original articles before acting on it.