Loading…

Siemens Energy signed an agreement with EnBW to supply two 62-MW SGT-800 gas turbines for converting the Stuttgart-Münster coal-fired CHP plant to gas, with hydrogen-ready capability up to 75% H2. The project could be operational by 2026.
“Siemens Energy on Nov. 17 sealed an agreement with the utility for an overall package that will ensure all systems at the conversion...to be fueled with hydrogen.”powermag.com
Summarized from public sources; check the original articles before acting on it.