Loading…
EnBW signed contracts with a consortium of General Electric, SENER and Bonatti for hydrogen-ready combined cycle gas turbine plants at Heilbronn and Altbach/Deizisau sites. The contract was announced on 13 September 2022.
“EnBW and a consortium consisting of General Electric, SENER and Bonatti signed contracts for the Heilbronn and Altbach/Deizisau sites.”mccoypower.net
Summarized from public sources; check the original articles before acting on it.