Loading…

Tashir Group will build a 50 MW thermal power plant on the territory of Hrazdan TPP in Armenia, costing about €30 million, creating 25 jobs, with completion by end of 2024. The plant will use MAN Energy Solutions equipment.
“Another TPP with a capacity of 50 MW will be built on the territory of Hrazdan TPP.”investin.am
Summarized from public sources; check the original articles before acting on it.