Loading…

Tashir Group will build a 126 MW thermal power plant in Noyemberyan, Armenia, costing over $120 million, creating 150 jobs, with construction starting in 2023 and lasting about two years.
“Tashir will build a new TPP with a capacity of 126 MW in the city of Noyemberyan.”investin.am
Summarized from public sources; check the original articles before acting on it.