Loading…
PJ Valves was contracted to supply six packages of valves for different topside process services, including gas and water, on the Mero 2 FPSO, which will produce 180,000 barrels of oil per day in Brazil.
“PJV has won further work for the Mero 2 FPSO, which will produce 180,000 barrels of oil per day.”worldoil.com
Summarized from public sources; check the original articles before acting on it.