Loading…
PJ Valves was awarded a contract to manufacture and supply butterfly, ball, globe and check valves for the Marlim 2 FPSO, which will process up to 70,000 barrels of oil and 4 million cubic meters of gas per day in the Santos and Campos basins.
“The Marlim 2 FPSO project will have the capacity to process up to 70,000 barrels of oil and 4 million cubic meters of natural gas per day.”worldoil.com
Summarized from public sources; check the original articles before acting on it.