Loading…

GE announced that installation and commissioning of the first two of three 9HA.01 gas turbines has begun at the 1.8 GW Hamriyah Independent Power Plant in the UAE. GE will supply the turbines and provide 25 years of repair and maintenance services.
“The first two of GE-supplied HA gas turbines for the 1.8 GW Hamriyah Independent Power Plant in the United Arab Emirates are currently undergoing installation and commissioning works, GE announced.”asian-power.com
Summarized from public sources; check the original articles before acting on it.