Loading…
Jacobs was selected as progressive design-build contractor for upgrades to the San José–Santa Clara Regional Wastewater Facility in California. The $200 million project will modernize biosolids treatment infrastructure, including digester upgrades and a new FOG receiving station.
“Jacobs has been selected as the progressive design-build contractor for upgrades to the San José–Santa Clara Regional Wastewater Facility (RWF) in California.”invest.jacobs.com
Summarized from public sources; check the original articles before acting on it.