Loading…
Nordgold has signed a $23 million EPC agreement with SUMEC to design and construct a 33 MW heavy fuel oil power plant at its Lefa gold mine in Guinea, expected to be completed by the end of 2021.
Nordgold signed an EPC agreement with SUMEC to design and construct a 33 MW heavy fuel oil power plant at its Lefa mine in Guinea. The plant is expected to be completed by the end of 2021.