JDR Cables, part of TFKable Group, has signed a contract with DEME Offshore to design, manufacture and deliver 78.1 km of inter-array cables for the 487 MW SeaMade offshore wind farm in Belgium. Delivery is expected by end of 2019.
Sif Holding N.V. announced that Dredging International awarded it a contract to produce 58 monopiles and primary steel for transition pieces for the SeaMade offshore wind farm in Belgium. The total volume is approximately 73.7 ktons, with production scheduled for 2019.
Developers of the Mermaid and Seastar wind farms in the Belgian North Sea merged the two projects into the 487.2MW Seamade. The merger was cleared by the European Commission, and Eneco Wind Belgium SA entered the share capital. Seamade NV aims for financial close by end of 2018, construction start in 2019, and commissioning by end of 2020.