Rohde Brothers, Inc. was awarded the contract for mechanical and HVAC improvements at the Village of Lena Wastewater Treatment Facility, including new process piping, HVAC systems, blowers, UV disinfection and control systems.
Rohde Brothers completed installation of refrigeration and HVAC systems for a new 138,000 square foot stand-alone freezer for Lakeside Foods in Manitowoc, Wisconsin, operating at -10°F. The project included three 123-ton ammonia refrigeration compressors and a 7 million BTU/hour evaporative condensing unit.
Masters Gallery Foods built a new 187,230 square foot cheese cutting and shredding plant in Oostburg, Wisconsin, featuring innovative ice storage, geothermal, and waste heat recovery systems. The facility includes refrigerated storage, three processing lines, and a test kitchen.