BHP will trial Caterpillar's Dynamic Energy Transfer system in the 2026–27 financial year to reduce diesel consumption.
Strategic Elements has secured its first commercial mining contract for Stealth Technologies' EdgeiQ OnSite platform, worth approximately A$225,000 initially. A separate EdgeiQ Portable pilot has also launched after five underground trials with a Tier 1 mining company.
Liebherr Indonesia has confirmed the full delivery of ten machines (four R 9200 excavators and six PR 776 dozers) to mining services contractor Darma Henwa for its Bengalon and Kintap sites in Kalimantan, Indonesia. Deliveries ran from Q3 2025 to April 2026.
SMS Mining Services selected Aquirian's subsidiary Drillforce as preferred supplier for drilling and blasting at its Mid West hub operations in Western Australia under a $32 million, two-year contract.
XCMG delivered a D360 bulldozer and an XE500G hydraulic excavator to a new client in South Africa's Northern Cape province. The delivery included on-site operator training.
Minerals Development Oman signed a $418.7 million, 10-year mining services contract with China's Hongda International for the Mazoon Copper Project in Oman. The deal includes open-pit mining activities at the Yanqul project, with production set to begin in 2027.
Brooks Equipment, a division of Brooks Group Australia, has introduced XCMG XDA45 articulated dump trucks to the Australian market, powered by Mercedes-Benz OM471 engines and Allison 4800 ORS transmissions. The company has brought 16 trucks into the country for sale and several for dry hire.
XCMG's XDE260 electric-drive mining trucks have officially entered operation with SimFer at the Simandou iron ore project in Guinea, under a major equipment supply contract. The trucks have a 230-tonne payload and are part of the primary mining fleet.
Zoomlion held a delivery ceremony on November 1, 2026, for its ZE2000G and ZE960G hydraulic mining excavators at the Huaneng Northern Weijiamao Coal Power Co Ltd open-pit coal mine in Ordos, Inner Mongolia.
RUSAL signed an agreement with Ghana Integrated Aluminium Development Corporation to develop the Nyinahin bauxite deposit in Ghana's Ashanti Region, with a 5 million mt/year bauxite mine and a 1.2 million mt/year alumina refinery. The deal was signed during the Russia–Africa Forum in Moscow on October 29, 2026.
Blue Moon Metals Inc. contracted RAM Enterprise Inc. for the refurbishment of the Springer processing plant at its Springer Tungsten Mine in Imlay, Nevada, with engineering by Nordmin Engineering Ltd. Refurbishment is expected to finish Q4 2027.
Thiess subsidiary MACA secured a two-year contract extension valued at approximately AUD 170 million at Emerald Resources NL's Okvau Gold Mine in Cambodia, extending operations through 2030.
Ampo Poyam Valves supplied an integrated smart solution with 25 severe-service ball valves, 25 control panels and one hydraulic power unit for CBMM's Tailings Thickening Dam No. 8 project at its Araxá plant in Minas Gerais, Brazil. The article is dated September 8, 2026.
Weir will supply 14 GEHO TZPM 2000 slurry pumps for a 200 km iron ore slurry pipeline extension being built by Lloyds Metals in India.
Lloyds Metals and Energy has awarded Weir an order for 14 GEHO TZPM 2000 positive displacement pumps with GLORES for the second phase of its 200 km slurry pipeline at the Surjagarh mine in Maharashtra, adding 16 million tonnes per year of capacity.
Lloyds Metals and Energy has awarded Weir an order for 14 GEHO TZPM 2000 positive displacement slurry pumps for the second phase of its Surjagarh mine slurry pipeline in Maharashtra, adding 16 million tonnes per year of capacity. The order was secured in Q1 2026.
Weir secured an order from Lloyds Metals and Energy to supply 14 GEHO TZPM 2000 positive displacement slurry pumps for the second phase of an iron ore slurry pipeline at the Surjagarh mine in Maharashtra. The order was secured in Q1 2026.
Lloyds Metals and Energy awarded Weir an order for 14 GEHO TZPM 2000 positive displacement pumps for phase two of its slurry pipeline at the Surjagarh mine in Maharashtra, India.
Lloyds Metals and Energy awarded Weir an order for 14 GEHO TZPM 2000 positive displacement pumps with GLORES for the second phase of its slurry pipeline at the Surjagarh mine in Maharashtra, India.
Weir Group won an order to supply 14 GEHO TZPM 2000 positive displacement pumps to Lloyds Metals and Energy for the second phase of its slurry pipeline at the Surjagarh mine in Maharashtra, India. No financial value was disclosed.
Lloyds Metals and Energy awarded Weir an order for 14 GEHO TZPM 2000 positive displacement pumps with GLORES for the second phase of its slurry pipeline at the Surjagarh mine in Maharashtra, India. The phase adds 16 million tonnes of annual capacity.
Weir Group secured a multimillion-dollar contract with a major Chinese non-ferrous metals company to supply Warman pumps for Phase III of a Xizang copper mine. The expansion will raise processing capacity from 19.9 to 30 million tonnes per year.
Weir has won a multimillion-dollar contract to supply its Warman pumps to a copper mine in Xizang (Tibet), China, which is undergoing a third expansion phase to raise processing capacity to 30Mtpa.
Minera Las Bambas awarded Ferreyros a contract to supply up to 45 Caterpillar mining equipment units, including 27 Cat 798 trucks (400-tonne), a Cat 7495 electric shovel, a Cat MD6380 drill, and auxiliary machines, to support production growth at the Las Bambas copper mine in Peru.
Metso signed an agreement with Southern Peru Copper Corporation to supply solvent extraction and electrowinning technology for the Tia Maria copper project in Cocachacra, Arequipa, Peru. The plant will produce 120,000 t of copper cathodes per year, and the order value of €100 million was booked in Metso's Q1 2026 order intake.
Halliburton announced that Petrobras awarded it multiple contracts for intelligent completions, electric safety valves and stimulation services in Brazil's deepwater fields, with work expected to begin in 2026.
Sandvik received a major underground mining equipment order from Oyu Tolgoi LLC for the Oyu Tolgoi copper-gold mine in Mongolia. The order is valued at approximately SEK 270 million and includes loaders and trucks, with deliveries from October 2025 through November 2026.
Metso signed an agreement to supply grinding, beneficiation and slurry pump equipment for Jinnan Iron & Steel's greenfield iron ore concentrator in Sohar, Oman, designed for 12.6 million tonnes annually, with operations expected in 2027. The order value was not disclosed.
Weir was selected by Codelco to supply tailings transport equipment for the Talabre tailings dam expansion in Chile's Atacama region. The initial contract awards are worth £40 million ($54 million) and represent the largest single order for Weir's GEHO pumps.
Epiroc won its largest order in company history, worth A$350 million, to supply Fortescue with autonomous and electric surface drilling equipment over five years for Pilbara iron ore mines in Western Australia.
Baker Hughes won a major multi-year fully integrated completions systems contract from Petrobras, following an open tender, to supply technology for deepwater offshore fields in Brazil.
KSB GIW won contracts to supply slurry pumps for Highland Valley Copper's Mine Life Extension project in Kamloops, British Columbia, including mill discharge, SAG underflow, tailings and froth pumps.
Weir Group was awarded contracts to supply WARMAN MCR 760 slurry pumps and CAVEX hydrocyclones for Teck's Highland Valley Copper Mine Life Extension project in British Columbia. The MCR 760 will be the largest mill circuit pump in North America.
KSB GIW was contracted to supply slurry pumps, including mill discharge, SAG underflow, tailings and froth pumps, for Teck's Highland Valley Copper Mine Life Extension project in Kamloops, British Columbia.
Weir Group has been awarded contracts to supply WARMAN MCR 760 slurry pumps and CAVEX hydrocyclones for Teck's Highland Valley Copper Mine Life Extension project in British Columbia, Canada. The pump will be the largest mill circuit pump in North America.
Weir Group has been awarded contracts to supply WARMAN MCR 760 mill pumps and CAVEX hydrocyclones for Teck's Highland Valley Copper Mine Life Extension project in British Columbia, Canada, the largest mill circuit pump in North America.
Weir won an order to supply what it describes as North America's largest mill pump. The article text is limited to the headline, so the customer and value are not stated.
The Weir Group has won a £25 million contract to supply Warman slurry pumps and separation solutions for the next phase of OCP Group's Louta and Benguerir phosphate projects in Morocco.
Morocco's OCP Group signed a £25 million (about $33 million) contract with Weir Group for slurry pumps and hydrocyclones at its Benguerir and Louta phosphate projects. Weir will also provide aftermarket service from its Moroccan service centre.
The Weir Group was awarded a £25 million contract to supply WARMAN slurry pumps and CAVEX hydrocyclones for the next phase of OCP Group's Benguerir and Louta phosphate projects in Morocco. The order will be recognised in the order book during Q3 2024.
TechnipFMC was awarded two subsea contracts by Petrobras for Brazil's pre-salt fields: a substantial contract for riser flexible pipe and a significant contract for subsea production systems for Atapu 2, Sepia 2 and Roncador, to be manufactured locally.
SLB OneSubsea, a joint venture of SLB, Aker Solutions and Subsea7, secured a Petrobras contract for subsea production systems for two ultra-deepwater fields offshore Brazil, with FPSOs expected to start producing from 2029.
SLB OneSubsea has won a Petrobras contract to supply pre-salt subsea production systems and services for the second development of the Atapu and Sepia fields in Brazil's Santos basin, with much equipment produced locally in Brazil.
The Weir Group won a £25m contract to supply separation solutions, including WARMAN slurry pumps and CAVEX hydrocyclones, for the next phase of OCP Group's Benguerir and Louta greenfield phosphate projects in Morocco. The order was announced in July 2024 and will be recognised in the order book in Q3 2024.
Weir Group has been awarded a £53m contract to supply HPGRs, screens, slurry pumps and hydrocyclones for Barrick's Reko Diq copper-gold project in Chagai, Balochistan, with the first £26m call-off booked immediately.
Linzhou Heavy Machinery signed an equipment purchase contract worth 745 million yuan with Shaanxi Yanchang Petroleum Material Group for hydraulic supports and electro-hydraulic control systems.
Sandvik won an underground mining equipment order worth $26 million (SEK200 million) from Jimond Mining Management for the Kamoa-Kakula copper mine expansion in the Democratic Republic of the Congo, with deliveries over the first nine months of next year.
TechnipFMC won a contract worth up to $250 million to supply subsea production systems to Azule Energy, the BP-ENI joint venture, for the Block 18 infill development offshore Angola. The announcement was made on June 27, 2023.
SLB's OneSubsea business and Subsea Integration Alliance won a large EPCI contract from bp for the Cypre gas project offshore Trinidad and Tobago, with offshore installation scheduled to start in 2024.
WestStar Industrial's subsidiary Alltype Engineering was awarded a circa A$33 million fabrication and installation contract by Lynas Rare Earths for its Kalgoorlie rare earths processing facility, to be completed during FY23.