Loading…

Wigen was awarded a contract by Veolia to supply a 10 MGD ultrafiltration system for the Columbia WTP in Boise, Idaho, replacing and expanding the existing 6 MGD system. First three trains to be operating by April 2023.
“Wigen has been awarded the contract to supply a 10 MGD UF system for the Columbia WTP that will replace and expand the capacity of the existing 6 MGD UF system that is near the end of its useful life.”wigen.com
Summarized from public sources; check the original articles before acting on it.