Loading…
Baker Hughes was awarded a contract by Modec to supply gas technology and turbomachinery, including LM2500 gas turbine generators and steam turbine generators, for the BM-C-33 FPSO in the Campos Basin pre-salt, Brazil, developed by Equinor with Repsol Sinopec Brasil and Petrobras.
“Baker Hughes has been awarded a contract by Modec, a supplier of offshore floating platforms, to supply gas technology equipment for the $9bn (43.6bn reais) BM-C-33 project in the Brazilian pre-salt Campos area.”offshore-technology.com
Summarized from public sources; check the original articles before acting on it.