Loading…
ANDRITZ won two turnkey contracts from COPEL to supply and commission additional generating units at Foz do Areia and Segredo hydropower plants in Paraná. The expansion adds over 2.1 GW, raising COPEL's capacity from 6.2 GW to 8.3 GW, with operation planned from 2030.