Loading…
Reach Integrated Sdn Bhd won a contract from SEA Hibiscus to supply, test, deliver, install and commission 10 motor operated valves with Rotork actuators and MIR Valve ball valves for the SF30 Water Flood Phase 2 project in the North Sabah PSC offshore oil field.
“SEAH has awarded Reach Integrated a Contract for Supply, Factory Tests, Delivery, Installation & Commissioning of 10 unit of Motor Operated Valves (MOVs) for the SF30 Water Flood Phase 2 Project.”reachintegrated.com
Summarized from public sources; check the original articles before acting on it.