Loading…
Baker Hughes Masoneilan shipped a package of API-6A severe service control valves for the Mero-3 FPSO in the Santos Basin, offshore Brazil, with the valves built at its Conde, France facility. Production on the field is expected in 2024.
“All valves were designed, manufactured, and tested with successful first pass yield in the Conde, France facility”valve-world.net
Summarized from public sources; check the original articles before acting on it.