Loading…
Suntar Membrane Technology Co Ltd completed the expansion of the Baicheng wastewater treatment plant, increasing capacity from 80,000 m³/d to 100,000 m³/d. The project cost 63.0477 million yuan.
“白城募投项目工程完工有利于提高公司市场占有率,进一步增强公司的行业的竞争力,并对公司的经营业绩带来积极影响。”h2o-china.com
Summarized from public sources; check the original articles before acting on it.