Loading…

Alabama Power is expanding the James M Barry electric generating plant in Alabama with two new 727MW natural gas-fired combined-cycle units (Units 8 and 9), totaling 1.4GW. Unit 8 began operations in November 2023, and Unit 9 is expected to be operational by November 2025.
“The power plant is being expanded with two new 727MW natural gas-fired combined-cycle units, 8 and 9.”power-technology.com
Summarized from public sources; check the original articles before acting on it.