Loading…

British Steel has signed a £100 million-plus deal with SeAH Wind and Severfield to supply over 30,000 tonnes of steel for the £450 million SeAH Wind monopile manufacturing facility at Teesworks. Severfield will fabricate the steel.
“A new £100million-plus deal between SeAH, British Steel and Severfield has now been signed which will see steel from British Steel’s Teesside Beam Mill used in the giant development.”teesvalley-ca.gov.uk
Summarized from public sources; check the original articles before acting on it.