Apr 28, 2023NEW FACILITYCrolles, France, France STMicroelectronics and GlobalFoundries to build €7.4B microchips plant in France
The European Commission approved French state aid for STMicroelectronics and GlobalFoundries to build and jointly operate a front-end semiconductor production facility in Crolles, France, with total investment of €7.4 billion. The plant is expected to produce 620,000 wafers per year by 2027.
Starts operating
5 Jun 2023
Capacity
620,000 wafers per year (300mm diameter)
Productshigh-performance chipsFD-SOI technology
“The European Commission has approved, under EU State aid rules, a French aid measure to support STMicroelectronics and GlobalFoundries in the construction and operation of a new microchips manufacturing facility in France.”design-reuse-embedded.com
- 5 sources
- design-reuse-embedded.comState aid: Commission approves French measure to support STMicroelectronics and GlobalFoundries to set up new microchips plantApr 28, 2023
- reuters.comSTMicroelectronics, GlobalFoundries win EU approval for French chip factoryApr 28, 2023
- presse.economie.gouv.fr05/06/2023 – Bruno Le Maire annonce le début de la production de la méga-usine de semi-conducteurs portée par GlobalFoundries et STMicroelectronics à Crolles et signe le contrat d’aide de l’Etat au projet – Presse – Ministère des FinancesMaxime Juestz de MireJun 5, 2023
- gf.comGlobalFoundries and STMicroelectronics Finalize Agreement for New 300mm Semiconductor Manufacturing Facility in France | GlobalFoundries
Summarized from public sources; check the original articles before acting on it.