Loading…

Greene Tweed is committing 43.6 billion won ($31.6 million) through 2028 to build a greenfield plant in Ochang, South Korea, that will produce up to 600,000 plasma-resistant elastomer sealing units annually for semiconductor fabs. The facility, completed in June 2024, creates 123 jobs.
“Greene Tweed is committing 43.6 billion won ($31.6 million) through 2028 to the greenfield project.”eastasiabrief.com
Summarized from public sources; check the original articles before acting on it.