Loading…

GE received a second order to supply a gas turbine for Eneva's Azulão II power plant expansion in Brazil. The project, which will add capacity to reach 590 MW, was tendered in September 2022 and is expected to begin commercial operation in 2027.
“A GE recebeu um segundo pedido para fornecimento da sua tecnologia de turbina a gás para a Eneva que será instalada na expansão da usina de Azulão II.”megawhat.uol.com.br
Summarized from public sources; check the original articles before acting on it.