Loading…

Keppel Infrastructure has reached FID to develop a 600MW hydrogen-ready CCGT power plant in Sakra, Jurong Island, Singapore. The EPC contract was awarded to a consortium of Mitsubishi Power Asia Pacific and Jurong Engineering. Total investment is around S$750 million, with completion expected in 1H 2026.
“The Keppel Sakra Cogen Plant will be the most cutting-edge and energy efficient power plant in Singapore, which will translate into superior performance.”power.mhi.com
Summarized from public sources; check the original articles before acting on it.