Loading…

The Turbigo thermoelectric power plant in Italy will be expanded with a new AE94.3A gas turbine, increasing capacity from 850 MW to about 1,280 MW, with first parallel by March 2022 and full operation by June 2022.
“The thermoelectric power plant in Turbigo has been equipped with a new AE94.3A gas turbine that will increase its capacity from the current 850 MW to about 1,280 MW, all of which will be fired by natural gas.”comesspa.com
Summarized from public sources; check the original articles before acting on it.