Loading…

Hitachi ABB Power Grids and LOS Cable Solutions AS have been selected by Lyse Elnett AS to deliver ELMEK equipment for the new Tronsholen transformer station in Norway. The contract includes a 145 kV GIS system, control systems, and 15,000 m of 145 kV cables.
“Hitachi ABB Power Grids og LOS Cable Solutions AS er valgt av Lyse Elnett AS for ELMEK leveranse til nye Tronsholen transformatorstasjon.”los-gruppen.no
Summarized from public sources; check the original articles before acting on it.