Loading…

The joint venture VIAS Y CONSTRUCCIONES (50%) and GS INIMA ENVIRONMENT (50%) was awarded a €32 million contract by MITECO for the expansion of the Albacete wastewater treatment plant, with a 42-month execution period.
“The Contracting Committee of the General Directorate of Water of the Ministry for the Ecological Transition (MITECO) held on October 28, 2020 has awarded the joint venture VIAS Y CONSTRUCCIONES, SA (50%) – GS INIMA ENVIRONMENT, SA (50%) the contract for 'Preparation of the Project and Execution of t”inima.com
Summarized from public sources; check the original articles before acting on it.