Loading…

A joint venture of Vías y Construcciones S.A. and GS Inima Environment SA was awarded a contract worth EUR 3.72 million to remodel the Boadilla del Monte wastewater treatment plant and pumping station, with a 24-month execution period.
“The contract includes the remodeling of the Boadilla del Monte WWTP Pumping Station with complete deodorized pretreatment for a maximum flow of 3.085 m3/h, storm tank, control building, AT line and inlet collector.”inima.com
Summarized from public sources; check the original articles before acting on it.