Loading…

GE Renewable Energy, EDF Renewables and Enbridge celebrated the production of the first Haliade 150-6 MW nacelle for the Saint-Nazaire offshore wind farm at the Montoir-de-Bretagne assembly plant. The 80-turbine wind farm is expected to become operational in 2022.
“The nacelle, which contains the generator, is the first in a series of Haliade 150-6 MW wind turbines, produced for the Saint-Nazaire offshore wind farm, to be assembled by GE Renewable Energy at the Montoir-de-Bretagne production site.”renewableenergymagazine.com
Summarized from public sources; check the original articles before acting on it.