Loading…

Mitsubishi Hitachi Power Systems (MHPS) received a full turnkey EPC contract from JERA Power Anegasaki to replace aging units 1-4 with three 650 MW-class M701JAC gas turbine combined cycle units at the Anegasaki Thermal Power Station in Ichihara, Chiba Prefecture, Japan. The total output will be 1,950 MW, with operations starting successively from early 2023.
“MHPS, has received an order and begun work on a full turnkey contract for construction of new Units 1-3 at the Anegasaki Thermal Power Station.”power.mhi.com
Summarized from public sources; check the original articles before acting on it.