Loading…
Mitsubishi Hitachi Power Systems (MHPS) received a full turnkey EPC contract from JERA Power Anegasaki to replace aging units with three 650 MW-class GTCC facilities using M701JAC gas turbines. Total output 1,950 MW, operations starting from early 2023.
“MHPS has received an order and begun work on a full turnkey contract for construction of new Units 1-3 at the Anegasaki Thermal Power Station.”asianspectator.com
Summarized from public sources; check the original articles before acting on it.