Loading…
Doosan Heavy Industries & Construction won a 120 billion won ($100.6 million) order from PLN to supply CFB boilers and turbines for the 110 MW Palu 3 thermal power plant on Sulawesi, Indonesia, with installation by 2023.
“Doosan Heavy Industries & Construction has won an order worth 120 billion won ($100.6 million) to supply boilers and turbines for a thermal power plant in Indonesia.”pulse.mk.co.kr
Summarized from public sources; check the original articles before acting on it.