Loading…
GE Renewable Energy's Grid Solutions, with Al Sharif Group, won a deal from Doosan Heavy Industries to build a turnkey 380-110 kV GIS substation powering the Yanbu-4 seawater desalination plant, scheduled to be operational in 2023.
“GE Renewable Energy's Grid Solutions has won a deal from Doosan Heavy Industries and Construction Co. Ltd., to build a turnkey substation that will power the Yanbu-4 independent water producer (IWP) plant.”zawya.com
Summarized from public sources; check the original articles before acting on it.