Loading…
Wärtsilä will supply generating sets with three 31DF dual-fuel engines each for two 30 MW power plants in Sumbawa and North Maluku, Indonesia, ordered by KEPCO E&C for state utility PLN, with operation expected in spring 2025.
Doosan Heavy Industries & Construction won a 120 billion won ($100.6 million) order from PLN to supply CFB boilers and turbines for the 110 MW Palu 3 thermal power plant on Sulawesi, Indonesia, with installation by 2023.