Loading…
Oracle Power PLC received approval from the Pakistani government to increase the capacity of its proposed coal-fired power station at Thar Block VI from 600MW to 700MW, using supercritical technology.
“Approval to increase the capacity of Oracle's proposed coal-fired power station to 700Mw from 600Mw was also granted along with the use of supercritical technology.”miningconnection.com
Summarized from public sources; check the original articles before acting on it.