Loading…
A new turbogenerator produced by ELSIB was installed at Pavlodar CHP-3 on September 8, 2018, increasing the station's capacity by 15 MW. The generator replaced an older unit and has a capacity of 125 MW.
“Мощность новой установки – 125 МВт”proektgaz.do.am
Summarized from public sources; check the original articles before acting on it.